Hiring Tips

Electrical Certificates and Part P Explained for Homeowners

Which electrical certificate you should get after work at home, what Part P means, which jobs are notifiable and what to do if a certificate is missing.

Illustration of a folder of electrical certificates on a hallway table

When you hear the phrase electrical certificate, it usually means one of three different documents given to you after electrical work. You will get an Electrical Installation Certificate for new circuits or consumer units, a Minor Works Certificate for small alterations, and a Building Regulations compliance certificate for notifiable work. This guide explains what paperwork you should receive, what Part P means for homeowners, and how to check your electrician is registered to sign off their own work.

What Part P means

Part P is a section of the Building Regulations that requires electrical work in a home to be designed and installed to protect people from fire and electric shock. Electricians working in England and Wales must comply with Part P. The rules apply to all electrical installation work in a home, garden, conservatory or outbuilding.

The rules are not exactly the same across the UK. In Scotland the Building Standards system applies instead of Part P. In Northern Ireland, there is currently no equivalent statutory requirement for domestic electrical installation work. You should always follow the local rules for the country you live in.

The regulations in England have also changed over time. In April 2013 the rules in England were updated to reduce the range of notifiable work, removing some requirements in areas such as kitchens and outdoor spaces. This means fewer small jobs need to be reported to building control today than in the past, but the work must still be safe.

Which electrical jobs are notifiable?

Notifiable work is major electrical work that must be reported to your local authority building control. In England, notifiable jobs include:

  • Installing a new consumer unit or fuse box
  • Installing a complete new circuit
  • Making alterations to existing circuits in special locations

In England, special locations are defined as the spaces around baths and showers. This means changing the wiring right next to a bath is treated much more strictly than changing a light switch in a hallway. In Wales, the rules are stricter because special locations also include kitchens and outdoors.

Most repairs, replacements and maintenance jobs are not notifiable. Alterations or additions to existing circuits outside special locations are also not notifiable. If you hire an electrician to replace a broken socket in your living room, or to add an extra light fitting in a bedroom, this does not normally need to be reported to building control.

Even if a job is not notifiable, it must still be done safely. All electrical work in your home must meet the national wiring standard, known as BS 7671 or the Wiring Regulations. You should still receive paperwork to prove the work was tested and meets these safety standards.

The Electrical Installation Certificate

You should receive an Electrical Installation Certificate if your job involved a new circuit or the installation of a new consumer unit or distribution board. A registered electrician should give you a completed certificate to show the work has been tested for safety. This document is your proof that the major new wiring in your home meets BS 7671.

An Electrical Installation Certificate is a detailed document. It lists the characteristics of your electricity supply, the details of the consumer unit, and the test results for the individual circuits, including safety devices like an RCD or RCBO. You will receive this certificate after large jobs such as a full house rewire or a consumer unit replacement.

When you are gathering quotes for major work, check that the price includes testing and certification. A proper quote is a fixed price that covers everything needed to leave the job safe and legal. Vague quotes often leave out important details, so you should check if your quote includes:

  • The cost of testing and certification
  • VAT on the labour and materials
  • Making good the plaster and decoration after the wiring is done

An estimate is not a fixed price and can change if the job takes longer than expected.

The Minor Works Certificate

If your job only involved an addition or an alteration to an existing circuit, it can be certified with a Minor Electrical Installation Works Certificate. This is a shorter, simpler document than a full installation certificate because it only covers the modified part of the wiring. It still confirms that the new addition meets BS 7671 and is safe to use.

You might receive a Minor Works Certificate after having an extra power point installed, or when an electrician alters the lighting circuit in a single room. These small jobs and fault finding tasks are usually charged by the hour. Your electrician will often apply a call-out fee or a minimum charge that covers the first hour of their time.

If you live in London and the South East, hourly rates will cost noticeably more than in other parts of the country. Asking an electrician to work out-of-hours also carries a premium. Regardless of when the work is done, you should always receive the correct minor works paperwork to prove the alteration was tested.

The Building Regulations compliance certificate

A Building Regulations certificate of compliance is required for any notifiable electrical job. Once notifiable work is complete, a registered electrician arranges for you to receive a Building Regulations compliance certificate within 30 days. They will also arrange for your local authority to be notified that the work has taken place.

When homeowners talk about a Part P certificate, they are usually referring to this compliance document. It is separate from the Electrical Installation Certificate. The installation certificate proves the wiring meets BS 7671 safety standards, while the compliance certificate confirms the work meets the Building Regulations and has been notified to building control.

You should receive both documents after major work like fitting a new fuse board. If you are ever unsure what paperwork a job needs, ask your electrician before they start. A good tradesperson will be happy to explain the rules and confirm exactly what documents they will provide when they finish.

Comparing electrical certificates

This table shows the main documents you might receive after electrical work and what each one is for. Local requirements will differ if you live in Scotland or Northern Ireland.

Document

When you get it

What it confirms

Electrical Installation Certificate

After a new circuit, consumer unit or distribution board

The work has been tested for safety and meets BS 7671

Minor Electrical Installation Works Certificate

After an addition or alteration to an existing circuit

The work meets BS 7671

Building Regulations compliance certificate

Within 30 days of completing notifiable work

The work meets the Building Regulations

Electrical Installation Condition Report

After periodic inspection and testing

Details damage, defects and dangerous conditions

The documents shown in this table reflect standard practice in England and Wales. The exact paperwork you receive will depend on the size of the job and whether the work is notifiable.

How these differ from an EICR

An Electrical Installation Condition Report is completely different from an installation certificate. An EICR is a report on the condition of an existing installation, not a certificate for new work. It details any observed damage, deterioration, defects, dangerous conditions and non-compliances with the current safety standard that might give rise to danger.

Landlords have legal duties to have installations inspected at least every five years, with nation-specific rules and substantial penalties in England. For owner-occupiers, periodic inspection is a recommendation, not a legal duty. If you are a homeowner, you might arrange an EICR to check your wiring is still safe, or a buyer might request one when you sell your house.

One common problem customers face is paying for very cheap inspections that are used to sell long lists of remedial work. Sometimes, minor advisory items are presented as failures to pressure you into paying for repairs. If you are told a full rewire or a new consumer unit is compulsory, ask to see the test evidence. If you are unsure, getting a second opinion is a sensible step before agreeing to expensive work. You can read more about how these reports work in our guide on what is an EICR certificate.

If your electrician is not registered

Electricians registered with a government-authorised competent person scheme can self-certify notifiable work. Scheme operators for electrical installations in dwellings include BESCA, Blue Flame Certification, Certsure (which runs NICEIC), NAPIT and OFTEC. Registered electricians appear on a single electrical competent person register that householders can search online. You should check this register yourself rather than just trusting a logo on a van.

If you use an unregistered electrician for notifiable work, or do the work yourself, you must follow a different route. You have two main options to ensure the work is legal:

  • Make a Building Regulations application to local authority building control before work starts, so it can be inspected and certificated by a building control body.
  • In England only, arrange for an electrician registered with a third-party certification scheme to inspect and certificate the work, provided they are notified before work starts.

The building control body can be the local authority or a private registered building control approver. If notifiable work goes ahead with no notification and no certificate, it does not comply with the Building Regulations, and the missing paperwork can cause problems when you sell the property.

What to do if a certificate is missing

Under the Consumer Rights Act 2015, a service must be carried out with reasonable care and skill. If a tradesperson has done poor work, you can ask for it to be put right at no extra cost. Services arranged at home, by phone or online usually carry a 14-day cooling-off period, but this does not automatically apply to urgent repairs you have specifically asked for.

If you have simply lost an installation certificate, contact the business that did the work to request a copy. If an electrician does not give you a certificate after major work, ask them for it first. If that does not work, contact the scheme operator the electrician claims to be registered with. The scheme can confirm whether they are registered and take you through its complaints procedure. If you are just missing the compliance document, duplicate Building Regulations compliance certificates can be bought from the scheme's notification service.

If you discover the electrician is not registered, the situation is more serious. You should report them to your local Trading Standards department. You cannot usually report a trader to Trading Standards directly, so you contact the Citizens Advice consumer service and it contacts Trading Standards on your behalf. It is important to report a trader who has done anything dangerous or unsafe.

Electrical Safety First also suggests having an Electrical Installation Condition Report carried out by a registered electrician. This will assess the work and act as documentation for it, but it comes at extra cost to you and is not the same as a Building Regulations compliance certificate.

Keeping your paperwork safe

You should keep both the electrical certificate and the Building Regulations compliance certificate safe for when the property is sold. Store them with your property deeds, boiler service records and other important home documents.

When you sell a house, the buyer's solicitor is likely to ask about electrical work carried out at the property and for the matching certificates. If you cannot produce the documents, it can delay the sale, and the buyer may ask for other evidence that the work is safe.

Having the right paperwork ready shows that the work was carried out and tested by a competent professional. It shows buyers that the property has been well maintained and prevents last-minute panics during the sale process.

Common questions

What is a Part P electrician?

When people talk about a Part P electrician, they usually mean an installer who is registered with a government-authorised competent person scheme. Registered installers can self-certify certain building work instead of getting building regulations approval from the local authority. Using a registered electrician makes the paperwork much simpler for notifiable jobs like fitting a new consumer unit.

Do I need a certificate for a new socket?

If you are adding a socket to an existing circuit outside a special location, the work is not notifiable but it must still be safe. You should receive a Minor Electrical Installation Works Certificate to show the addition has been tested and meets BS 7671. If you add a socket on a completely new circuit, or in a special location, which in England means near a bath or shower and in Wales also includes kitchens and outdoors, the work becomes notifiable and you should also receive a Building Regulations compliance certificate.

Can an unregistered person do electrical work?

An unregistered person can do electrical work, but if the work is notifiable they cannot self-certify it. Building control, or in England a registered third-party certifier, must be told before the work starts and will inspect and certificate the work. If an unregistered person does notifiable work without telling building control, you will have no legal paperwork for the job.

How long does it take to get a Part P certificate?

Once notifiable work is complete, a registered electrician arranges for your local authority to be notified. They also arrange for you to receive a Building Regulations compliance certificate within 30 days. If you do not receive the compliance certificate within this time, you should contact the electrician's registration body to follow up.

Next steps

Before you hire someone to do electrical work in your home, make sure you know exactly what paperwork to expect.

  • Check if your planned work is notifiable under the Building Regulations for your country.
  • Search the electrical competent person register to check if your chosen electrician is registered with a scheme.
  • Ask your electrician to confirm in writing that their quote includes testing and issuing the correct electrical certificate.
  • Agree on a payment schedule that does not involve large cash deposits with no paperwork.
  • Keep your certificates and compliance documents safe for when you eventually sell the property.

If you are ready to get quotes for your next job, you can find an electrician near you to discuss what you need and what paperwork will be provided.

Find a top rated electrician near you

4,987 electricians across the UK, each ranked on their Google rating and the number of reviews behind it. Start with your county:

All counties and towns · The UK Top 100 electricians

Amira Hussain
Written by
Amira Hussain Writer

Amira is a writer and editor for Top Rated Electricians, covering electrical work, safety checks and EV chargers. When she's not writing guides, she plays five-a-side on Tuesday nights.

Looking for a trusted electrician? Browse our verified listings.

Find an Electrician